HomeMy WebLinkAbout0116934-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 322SARATOGAAVE
CITY OF OSHKOSH
No
116934
BUILDING PERMIT - APPLICATION AND RECORD
Owner SHAWN M GARTZKE
Create Date
10/25/2005
Designer
Contractor
WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths
Zoning
Size
Unfinished/Basement
--.2 Sq. Ft.
--.2 Sq. Ft.
0 Projection I
Finished/Living
Canopies --.2
Garage
--.2 Sq. Ft.
Signs
--.2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Pennit Not Required
Park Dedication
Not Required
# Dwelling Units --------':J
# Structures
0
Use/Nature
of Work
FRilnstaliation of 19 vinyl replacement windows in existing openings - NO STRUCTURAL WORK
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$6.014.00 Plan Approval
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Issued By:
Date 10/25/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1008120000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 625 FOND DU LAC AVE
Agent/Owner
FOND DU LAC
WI 54935 - 0000
Telephone Number
920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not peñormed within two business days from the time the project is ready.