HomeMy WebLinkAboutFIELD NOTICE
~
CORRECTION NOTICE I FIELD INSPECTION REPORT
JOB LOCATION: ~~;æ
/'fttJ¡,;d
PROJECT TO BE INSPECTED: ~//Jl'h ,
~
City of Oshkosh
Inspection Services Division
215 Church Avenue, PO Box 1130
Oshkosh, WI 54903-1130
Phone: (920) 236-5050
Fax (920) 236-5084
CONTRACTOR:
BUILDING: :a: ELECTRIC: PLUMBING: EROSIW CONTROL: PROPERTY MAINT,:
Footing Rough Rough T"oking Sotb"k Pork,
~on Smi" T,stOn SiltF,n" Un1i"""d V"----
ou h NC T,mp p,,", Und"Ooor Ston, Ac"ss G""'g'
InsuI"ion Fi"pI'" UG OH S,w"IW"" Strnw B,I" DiI,pid,wd bId's, ['n"',
R,-insp, R,-insp, R,-insp, R,-insp, R,-i",p, ,to,
Fi..1 Fi..1 Fin,I Fi..1 Fi..1 ExtM,int
'.m-EMIt _-£ODE , ',D.',X,y, : ",y,"'; ,. INSPECTION RESULTS '
I IlIfl.fii II -,- 1.", /' l.'IA ,r,;J ~....rr 11-3
J
Z 'Pmv/'tk MAJ. A -- I .C- P"),~vfl.. -/,;n dV....h kAAI-Å
" /
3 J,g)., J J -J--lt ~1.¡'1?'" nrá,r --;ç:; )JPVI"l;" ððl Ùb ¡~ J
...I I , ../ ' '
VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS OTHERWISE NOTED, CALL FOR RE-INSPECTIONS PRIOR TO
CONCEALMENT AND/OR OCCUPANCY, WHEN CORRECTIONS ARE COMPLETED THE OWNER/CONTRACTOR IS REOUIRED TO SIGN & DATE THIS
NOTICE AND RETURN IT TO THE INSPECTION DIVISION WHEN REOUESTING ARE-INSPECTION.
COMPLIANCE DATE:
ACTION TAKEN:
Not Approved! Insp, Report given to
0 Mailed!Faxed
JoJ.,.. z
7-8 - ZbJZ-
Date ofInspection
236 s-IQ
Phone #
~
CORRECTION NOTICE I FIELD INSPECTION REPORT
JOB LOCATION:,:(þ'4~""""""V'T,,1Ç(¡;¡;,Ø-JØ~'W
.~..,"" 1 "'" 1ã . ..¡¡j=-
CONTRACTOR: A/rÅ1er-t
Itví-J-')
~
City of Oshkosh
Inspection Services Division
215 Church Avenue, PO Box 1130
Oshkosh, WI 54903-1130
Phone: (920) 236-5050
Fax (920) 236-5084
PROJECT TO BE INSPECTED:
BUILDING:
Footing
Foundotion
H :
Rough
u"
NC
Fi"PI'"
R,-insp,
Fi",1
ELECTRIC:
Rough
Smi"
Temp
UG
R,-i",p,
Fin,I
p,,",
OH
PLUMBING:
Rough
TestOn
Underfloor
S,w"IW'ter
R,-insp,
Fino'
EROSIO~ CONTROL
Trnoking
Silt F'n"
Sto", Ao"ss
S.,wB,I"
R,-insp,
Finol
PROPERTY MAINT,:
Sotb"k Pork,
Un1i"""d V,h
G""'g'
Di1>pid'ted bId's, fences,
,to,
Ex!. M,in!.
Insu1>tion
Re-insp,
Finol
, .CODE
VIOLATIONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS OTHERWISE NOTED, CALL FOR RE-INSPECTIONS PRIOR TO
CONCEALMENT AND/OR OCCUPANCY, WHEN CORRECTIONS ARE COMPLETED THE OWNER/CONTRACTOR IS REOUIRED TO SIGN & DATE THIS
NOTICE AND RETURN IT TO THE INSPECTION DIVISION WHEN REOUESTING ARE-INSPECTION.
COMPLIANCE DATE:
ACTION TAKEN:
0 Not Approved! Insp, Report given to
0 Mailed!Faxed
~. 7-8.Z'CO¿
Date ofInspection
Z.3b 5//3
Phone #