HomeMy WebLinkAbout2005-Building (addition demo)
e
OSHKOSH
ON THE WATER
Job Address 432434 N MAIN ST
CITY OF OSHKOSH
No
116950
BUILDING PERMIT. APPLICATION AND RECORD
Owner TOO MAR PROPERTY MANAGEMENT
Create Date
10/07/2005
Contractor
R J ALBRIGHT INC.
Designer
Category
205 - Alteration Amusement, Social, Recreation
Plan
Type
. Buiiding
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
D Projection I
Canopies ~
Signs
~
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature
of Work
avem/ Demolition in preparation to expand tavern into south 1/2 of building.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$4,000.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
Date 10/25/2005
Final/O.P. 00/00/0000
D PenmitVoided i
Parcelld # 0400880000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to.s.7cure...any .necessary ap¿;;:als before starting such activity. . ,~ / ,'- 1.-
Signature If'~: #~ ~ c. ~ Date / c:yÞ') /¿J')
. , Agent/Owner
Address 5711 GREENVALLEYRD
OSHKOSH
WI 549O4 - 0000
Telephone Number
231-8635
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.