Loading...
HomeMy WebLinkAbout2005-Building (addition demo) e OSHKOSH ON THE WATER Job Address 432434 N MAIN ST CITY OF OSHKOSH No 116950 BUILDING PERMIT. APPLICATION AND RECORD Owner TOO MAR PROPERTY MANAGEMENT Create Date 10/07/2005 Contractor R J ALBRIGHT INC. Designer Category 205 - Alteration Amusement, Social, Recreation Plan Type . Buiiding 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths D Projection I Canopies ~ Signs ~ Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature of Work avem/ Demolition in preparation to expand tavern into south 1/2 of building. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 10/25/2005 Final/O.P. 00/00/0000 D PenmitVoided i Parcelld # 0400880000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to.s.7cure...any .necessary ap¿;;:als before starting such activity. . ,~ / ,'- 1.- Signature If'~: #~ ~ c. ~ Date / c:yÞ') /¿J') . , Agent/Owner Address 5711 GREENVALLEYRD OSHKOSH WI 549O4 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.