Loading...
HomeMy WebLinkAbout0116952-Building (driveway) '~e OSHKOSH ON THE WATER Job Address 101 KNAPP ST CITY OF OSHKOSH No 116952 BUILDING PERMIT - APPLICATION AND RECORD Owner' ANDREW P/LiSA L SCHWEDA Create Date 10/25/2005 Designer Contractor OWNER Category 256. Parking Lots, Driveways Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~ Sq, Ft. ~ Sq, Ft. Rooms 0 Height 0 Ft. D Projection I Canopies 0 Finished/Living Bedrooms Stories Garage ~Sq.Ft. Baths Signs ~ Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ~ # Structures ~ Park Dedication Use/Nature SFRI Paving the driveway and parking area iocated along the side of the detached garage with asphalt. The parking area will be of Work creened per the plan submitted. HVAC Contractor Plumbing Contractor Electric Contractor Fees: valu;~:l "-- Issued By: I ~ $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 10/25/2005 Final/O.P, 00/00/0000 D Permit Voided I Parcelld # 0607190000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) anli to e u any necessary approvals before starting such activity. j. AgenUOwner OSHKOSH Date ~ cJ :d :s -() Signature Address WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within tWo business days from the time the project is ready. c Q) .c E I ~õ~ d!~¡¡ ~ sz!å Et3 I;~1ijþ '--, 0 ~ g.'¡: a (')0 E E 0 () C> '? "t:: ~ -T- .3 % '~~ é:'<::, ~ û5 c. c. C\J c: :::.::: \ ~\ ~~ ~~a \j - I 111111 Ii! (j) LOZ<3 8-,'i5 N. >, ~ ~cn8 ~ 'õ ..0 Z. .8 G (,) ;; 0 ~ 0 (j) 0 N \I z~ ...- 0 ...- Qj ro () (f) 'ß c!&t:JU ;( '\ -"1~