HomeMy WebLinkAbout0116947-Building (overhead door)
e
OSHKOSH
ON THE WATER
Job Address 2950 BRADLEY ST
CITY OF OSHKOSH
No
116947
BUILDING PERMIT - APPLICATION AND RECORD
Owner VIKING VENTURES L TO
Create Date
10/25/2005
Designer
Contractor
OWNER
Category
211 - Alteration industrial
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Canst:
Rooms 0 Height 0 Ft.
Bedrooms Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Zoning
Size
Finished/Living
-----..---2 Sq. Ft.
-----..---2 Sq. Ft.
D Projection I
Unfinished/Basement
Canopies -----..---2
Garage
-----..---2 Sq.Ft.
Signs
-----..---2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature IND/lnstall overhead door in existing opening. NO STRUCTURAL CHANGES. N-ew Owner-Peter Pischke.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 10/25/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1413210000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and,<õS.ï?cure an nee s a approvals~r~rting such activity. ----
Signature /( ~ Date¿tJ ~y.D;>
AgenUOwner
Address PO BOX 3892
OSHKOSH
WI 54903 - 3892
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 notin9 the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.