Loading...
HomeMy WebLinkAbout0116947-Building (overhead door) e OSHKOSH ON THE WATER Job Address 2950 BRADLEY ST CITY OF OSHKOSH No 116947 BUILDING PERMIT - APPLICATION AND RECORD Owner VIKING VENTURES L TO Create Date 10/25/2005 Designer Contractor OWNER Category 211 - Alteration industrial Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Canst: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 0 Pier 0 Other 0 Treated Wood Zoning Size Finished/Living -----..---2 Sq. Ft. -----..---2 Sq. Ft. D Projection I Unfinished/Basement Canopies -----..---2 Garage -----..---2 Sq.Ft. Signs -----..---2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature IND/lnstall overhead door in existing opening. NO STRUCTURAL CHANGES. N-ew Owner-Peter Pischke. of Work HVAC Contractor Plumbing Contractor Electric Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 10/25/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1413210000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and,<õS.ï?cure an nee s a approvals~r~rting such activity. ---- Signature /( ~ Date¿tJ ~y.D;> AgenUOwner Address PO BOX 3892 OSHKOSH WI 54903 - 3892 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 notin9 the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.