Loading...
HomeMy WebLinkAbout0116928 B e OSHKOSH ON THE WATER Job Address 872 W 18TH AVE CITY OF OSHKOSH No 116928 BUILDING PERMIT - APPLICATION AND RECORD Owner WilLIAM CHESSER Create Date 10/25/2005 Designer Contractor IMPRESSIVE ROOFING AND SIDING INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: Size Unfinished/Basement ~Sq.Ft. ~ Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature SFRI Tear-off roofing. Install new roofing on house and garage - NO STRUCTURAL WORK of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $6,112.25 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Issued By: Date 10/25/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1410080700 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 2786 Agenl/Owner APPLETON WI 54912 - 2786 Telephone Number 232-1669 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.