HomeMy WebLinkAbout2005-Building (alterations)
e
OSHKOSH
ON THE WATER
Job Address 2075 S WASHBURN ST
CITY OF OSHKOSH
No
116926
BUILDING PERMIT - APPLICATION AND RECORD
Owner ANDREW HOMES INC
Create Date
10/24/2005
Designer
Contractor
ANDREW HOMES
Category
223 - Alteration Offices, Banks, Professional
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories
Garage ----.2 Sq. Ft. Baths 0
D Projection I
Canopies
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
II Dwelling Units ~
II Structures
0
Use/Nature í'Jterations to revert space back into two tenant spaces. Close openings created when combining th,e ,two spaces into one office.
of Work
HVAC Contractor
Electric Contractor'
Plumbing Contractor
Fees: Valuation
Issued By: ~
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 10/24/2005
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld II
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
4?A. ~
Date
Iv/1- <{ Ny
Signature
Address 2075 S WASHBURN
Agent/Owner
OSHKOSH
WI 54904 - 8946
Telephone Number
233-7870
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.