HomeMy WebLinkAbout0116898-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 171 175 S WESTFIELD ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116898
Owner BELLE PLANE INVESTMENTS LLP
Create Date 10/21/2005
Contractor MARSHALL PLUMBING
Category 401 - Residential-Exterior (laterals)
Plan
Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 LndryTray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature r'='.M~~
of Work
Size Material Type #I Conn. Type
Sanitary Sewer 4" Plastic Lateral 1 New
0
0
0
0
Storm Sewer 4" Plastic Lateral 1 New
0
0
0
0
Water Service 11/2" Copper Lateral 1 New
0
0
0 Parcelld #I
0 0615130000
Valuation $1.800.00 Plan Approval $0.00 Permit Fees $150.00 D PennitVoided I
Issued By Date 10/21/2005
In the perfonnance of this work. I agree to perform all work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address N2026 29TH LN
Agent/Owner
REDGRANITE
WI 54970 - 0000
Telephone Number 361-4846
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.