Loading...
HomeMy WebLinkAbout0116898-Plumbing e OSHKOSH ON THE WATER Job Address 171 175 S WESTFIELD ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 116898 Owner BELLE PLANE INVESTMENTS LLP Create Date 10/21/2005 Contractor MARSHALL PLUMBING Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 0 LndryTray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature r'='.M~~ of Work Size Material Type #I Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New 0 0 0 0 Storm Sewer 4" Plastic Lateral 1 New 0 0 0 0 Water Service 11/2" Copper Lateral 1 New 0 0 0 Parcelld #I 0 0615130000 Valuation $1.800.00 Plan Approval $0.00 Permit Fees $150.00 D PennitVoided I Issued By Date 10/21/2005 In the perfonnance of this work. I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this pennit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address N2026 29TH LN Agent/Owner REDGRANITE WI 54970 - 0000 Telephone Number 361-4846 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.