HomeMy WebLinkAbout2005-Building (partition & door)
"e
OSHKOSH
ON THE WATER
Job Address 555 S WASHBURN ST
CITY OF OSHKOSH
No
116858
BUILDING PERMIT. APPLICATION AND RECORD
Owner PR & PS ENTERPRISES
Create Date
10/19/2005
Designer
Contractor
TENANT
Category
223 - Alteration Offices, Banks, Professional
Plan
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Type
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies 0
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature South Tenant Suite/ Miscellaneous partition and door/passage alterations. . Tenant is Tannan Properties. LLC.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuatio
$6,000.00 Plan Approval
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Issued By:
Date 10/19/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0614610000
In the performance of this work I agree to perform all work pursuant to nules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work
described in this p "t application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s)andtose' y e<>¡ssa~~ngSUChactivity. Date ¡/")-/a_~
Signature M t ¡ 1/ (
AgenUOWner
OSHKOSH
WI 5490:1.-0000 TelephoneNumber'2~f-'2--s-s.""1-
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.