Loading...
HomeMy WebLinkAbout2005-Building (partition & door) "e OSHKOSH ON THE WATER Job Address 555 S WASHBURN ST CITY OF OSHKOSH No 116858 BUILDING PERMIT. APPLICATION AND RECORD Owner PR & PS ENTERPRISES Create Date 10/19/2005 Designer Contractor TENANT Category 223 - Alteration Offices, Banks, Professional Plan . Building 0 Sign 0 Canopy 0 Fence 0 Raze Type Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature South Tenant Suite/ Miscellaneous partition and door/passage alterations. . Tenant is Tannan Properties. LLC. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuatio $6,000.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Issued By: Date 10/19/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0614610000 In the performance of this work I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this p "t application within an easement, the City strongly urges the permit applicant to contact the easement holder(s)andtose' y e<>¡ssa~~ngSUChactivity. Date ¡/")-/a_~ Signature M t ¡ 1/ ( AgenUOWner OSHKOSH WI 5490:1.-0000 TelephoneNumber'2~f-'2--s-s.""1- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.