Loading...
HomeMy WebLinkAbout0116868 H ~ OSHKOSH ON THE WATER Job Address 1666 MARICOPA DR CITY OF OSHKOSH HVAC PERMIT -APPLICATION AND RECORD 116868 No Owner MRiMRS ARTHUR A LEMKE Create Date 10/19/2005 Plan Contractor Fuel PREMIUM AIR INC I~ Gas System n New ~ Forced Air I I Electric Chimney Type K) Chimney A Heat Loss K) As Approved K) As Per Plan BTU Rate Category 500 - Residential-Heating & Ventilating I I Oil I I Electric M Replace I I Solar I I Solid D Other U Radiant I I Hot Water U Steam I I Suppl. . Direct Vent U AlC I I I Con. Burner I ( ) Not Applicable U Vent () Chimney B . Existing ( ) Not Applicable . Other Value ( ) Variable Value 45000 Use/Nature FRI Repalce furnace, --No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS of Work PPLIANCE No chimney liner being installed --- Nhere an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control ue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draf Fees: Valuation $3,265.00 Issued By: Plan Approval $0.00 Permit Fee Paid $54.50 Date 10/19/2005 D PenmitVoided I Parcelld 111316560100 In the performance of this work, I agree to perfonm all work pursuant to nuies governing the described constnuction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N3225 HWY 15 HORTONVILLE Telephone Number 920-982-3323 WI 54944-0 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.