Loading...
HomeMy WebLinkAbout0116857-Building (front steps) e OSHKOSH ON THE WATER Job Address 123 W 24TH AVE CITY OF OSHKOSH No 116857 BUILDING PERMIT - APPLICATION AND RECORD Owner PETER A SCHNEIDER Create Date 10/19/2005 Designer Contractor DROESSLER CUSTOM HOMES Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~ Sq. Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies Garage ~Sq.Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature fJRI Removing the existing cencrete steps and censtructing a 4'x6' landing w/ frost protection and steps for the front axit. Code of Work cempHant guardrails and handrails are required. HVAC Contractor Plumbing Contractor Electric Contractor Issued By: $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 10/19/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 1413370100 In the performance of this work I agree to perform all work pursuant to rules governing the described censtruction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this permit application within an easement, the City strongly urges the permit appiicant to centact the easement :;~d:~:::ez=n d t ecure any ne~:pprov~g such activity. IC I D / v Agent/Owner Dar ' /f;/or Address 430 ZARLING AVE OSHKOSH WI 54901 - 0000 Telephone Number 232-3548 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.