HomeMy WebLinkAbout0116857-Building (front steps)
e
OSHKOSH
ON THE WATER
Job Address 123 W 24TH AVE
CITY OF OSHKOSH
No
116857
BUILDING PERMIT - APPLICATION AND RECORD
Owner PETER A SCHNEIDER
Create Date
10/19/2005
Designer
Contractor
DROESSLER CUSTOM HOMES
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~ Sq. Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature fJRI Removing the existing cencrete steps and censtructing a 4'x6' landing w/ frost protection and steps for the front axit. Code
of Work cempHant guardrails and handrails are required.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
$1,500.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 10/19/2005
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1413370100
In the performance of this work I agree to perform all work pursuant to rules governing the described censtruction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this permit application within an easement, the City strongly urges the permit appiicant to centact the easement
:;~d:~:::ez=n d t ecure any ne~:pprov~g such activity. IC I D /
v Agent/Owner Dar ' /f;/or
Address 430 ZARLING AVE OSHKOSH WI 54901 - 0000 Telephone Number 232-3548
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.