Loading...
HomeMy WebLinkAbout0116853-Plumbing (water main) G OSHKOSH ON THE WATER Job Address 1551 DELAWARE ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Contractor VAN HANDEL EXCAVATING INC Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 ~ ~ ~ 0 ~ 0 ~ ~ Owner OSH AREA SCHL DIST SOUTH PARK Category 430 -Industrial-Exterior (laterals) Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn 0 0 0 0 0 0 0 0 0 Wait.St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 No 116853 Create Date 10/18/2005 Plan Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature of Work I-'"~"~~~' Sanitary Sewer Size Storm Sewer Water Service 4 inch Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 Relay Valuation o. Parcelld # 1301920000 Issued By Plan Approval $0.00 Plastic Lateral Date 10/18/2005 In the performance of this work, I agree to perform all work pursuant to rules govemlng the described construction. While the City oi Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any nece ry a~prova~ be.:?re starting such activity. Signature fI~ Agent/Owner Address 5325 N BALLARD RD APPLETON Permit Fees $50.00 0 Permit Voided I Date /tJ-/f{-~ WI 54913 - 0000 Telephone Number 730-9000 MPRS 31 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.