Loading...
HomeMy WebLinkAbout0116839-Plumbing (abandon sewer) e CITY OF OSHKOSH No 116839 OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 641W8THAVE Owner AMBER BUCK Create Date 10/18/2005 Contractor HANNA EXCAVATING Category 401 - Residential-Exterior (laterals) Plan Bathtub ~ Shower 0 Water Softner 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain ~ Local Waste ~ Ice Chest 0 FlrlWst Sink ~ Int Grease Trap 0 Lavatory ~ Lndry Tray 0 Clothes Wshr ~ Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Res. Sink 0 Dishwasher ~ Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink ~ Sterilizer ~ Surgeons Sink 0 Ice Maker ~ Deduct Meters 0 Site Drain 0 Breakrm Sink ~ DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn ~ Serv Sink 0 Soda Disp 0 Misc. ~ Fixtures Use/Nature ofWork FRI Abandon sewer and water laterals due to the razing of the house. Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 Aband 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 1" Copper Lateral 1 Aband 0 0 0 Parcelld # 0 0601210100 Valuation 11. $1,000.00 Issued By: k Plan Approval $0.00 Permit Fees $100.00 0 Permit Voided I Date 10/18/2005 in the performance of this work, I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in thi plication within an easement, the City strongly urges the permit applicant to contact the easement hold secure any necessa approvals before starting such activity. Da~/¿/./ð -óS- AgenVOwner OSHKOSH ~ 54904 - 0000 Telephone Number 235-6450 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.