Loading...
HomeMy WebLinkAbout0116840-Building (raze) G OSHKOSH ON THE WATER Job Address 641 W 8TH AVE CITY OF OSHKOSH No 116840 BUILDING PERMIT - APPLICATION AND RECORD Owner AMBER BUCK Create Date 10/18/2005 Designer Contractor OWNER Category 161 - Wrecking Residential Dwellings Plan Type 0 Building 0 Sign 0 Canopy 0 Fence . Raze Zoning Class of Const: Size Unfinished/Basement ---9. Sq. Ft. Rooms Finished/Living ---9. Sq. Ft. Bedrooms Garage ---9. Sq. Ft. Baths Height 0 Ft. 0 Projection I Stories Canopies ---9. Signs ---9. Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRI Razing the existing 1 story home. All debris including concrete to be removed and grass established. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~AJ-- $3.000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 10/18/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0601210100 In the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application witihin an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec:r'Jny necessary approvals)Sefore start~uc. h activity. Signature'f K&~~ 1c5~ Daie-,.O/Ò -(;8 - ö,s AgenUOWner (- Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.