HomeMy WebLinkAbout0116828-Plumbing (water heater)
0 CITY OF OSHKOSH No 116828
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1125 N WESTFIELD ST Owner EVERGREEN MANOR INC Create Date 10/17/2005
Contractor WATTERS PLUMBING Category 411-Residential-WaterHeaters Plan
Bathtub 0 Shower 0 WaterSoftner 0 WaitSt 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
ofWork
rw""~~'
Type
#
0
0
0
0
0
Size
Material
Conn. Type
Sanitary Sewer
Storm Sewer
Valuation
$695.00
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1608630100
Water Service
Issued By
Date 10/17/2005
In the performance of this work, I a9ree to perfonm all work pursuant to rules 90verning the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 118
Agent/Owner
MENASHA
WI 54952 - 0118
Telephone Number 920-733-8125
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.