Loading...
HomeMy WebLinkAbout0116799-HVAC (furnace) ~ OSHKOSH ON THE WATER Job Address 1329 CENTRAL ST CITY OF OSHKOSH No 116799 HVAC PERMIT - APPLICATION AND RECORD Owner GORGENE D NIEMUTH Create Date 10/17/2005 Plan Contractor AIR TECH HEATING INC 1v'1 Gas Category 500 - Residential-Heating & Ventilating Fuel I I Oil I I Solar I I Solid System 0 New ~ Forced Air I I Electric I I Electric [7] Replace 0 Other U AlC I I I Con. Burner I ( ) Not Applicable U Vent U Radiant I I Hot Water U Stearn I I Suppl. Chimney Type r) Chimney A Heat Loss r ) As Approved r) As Per Plan ( ) Chimney B . Existing . Direct Vent BTU Rate ( ) Variable ( ) Not Applicable . Other Value Value 60000 Use/Nature ISFRI Repalce furnace, No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE of Work No Chimney liner beinf installed--Where an appliance is permanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the Interior of the CN and to provide the appliance or appliances served with th eq. draft. Fees: Valuation $2,965.00 Plan Approval $0.00 Permit Fee Paid $50.00 Issued By: Date 10/17/2005 0 Permit Voided I Parcelld # 1500780000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 130SA INDUSTRIAL PKWY FOND DU LAC WI 54937-0 Telephone Number 920-924-6742 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.