HomeMy WebLinkAbout0116821-Building (exterior repairs)
e
OSHKOSH
ON THE WATER
Job Address 667 BOWEN ST
CITY OF OSHKOSH
No
116821
BUILDING PERMIT - APPLICATION AND RECORD
Owner STEVEN F/ROSE M FAUST
Create Date
10/17/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height a Ft.
0 Projection I
Canopies a
Finished/Living
Bedrooms a
Stories
Garage
~Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units a
# Structures
~
Park Dedication
Use/Nature Duplex! Repair roof. fascia, exterior stairs and other mise items from Housing correction notice.
ofWork
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation
$1 000 00 Plan Approval
Yr' .
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 10/17/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1102060000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any neces ary provais before starting such activity.
~.
AgenUOwner
)<
Date )(')0 ../'7-<::J.f
Signature
Address 204 WYLDE BERRY LN
OSHKOSH
WI 54904 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perfonmed within two business days from the time the project is ready.