Loading...
HomeMy WebLinkAbout0116819-Building (driveway/patio) -~r OSHKOSH ON THE WATER Job Address 345 BAY ST CITY OF OSHKOSH No 116819 BUILDING PERMIT - APPLICATION AND RECORD Owner ARVIN FIDIANN G BENTLE Create Date 10/17/2005 Designer Contractor BILL'S CONSTRUCTION Category 142 - Decks, Patios, Ramps Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq,Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Signs Garage ~Sq.Ft. Baths Foundation . Poured Concrete 0 Fioating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units --.J! # Structures --.J! Park Dedication Use/Nature "FRI Constructing a driveway and patios. Parking shall not be permitted on the patio areas. of Work Plumbing Contractor HVAC Contractor Electric Contractor Fees: Valuation $3,250.00 Plan Approval ~ $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: Date 10/17/2005 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 0201730000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and to securtan ecessary approvals efore rting such activity. / /---- Signature í Date xfd(t?/éT<:' Address 1331 EVANS ST OSHKOSH WI 54901 - 0000 Telephone Number 920-303-1160 To schedule inspections please call the Inspection Requ<!'st line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. l" . ZONING/LAND USE COMPLIANCE CHECKLIST JOB LOCATION: 3-4s- B<1,! 'St PROPERTY OWNER/CONTRACTOR: ZONING: CONSTRUCTION DATA: 0 New Construction 0 Addition TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) 0 Alteration DrlÎ/e.A1" v , f- OA.&;") f COMPLIANCE CHECKLIST 3êSO DEFICIENT DEFICIENT 0 Use 0 Lot Width 0 Lot Area 0 Lot Area Per Family 0 Flood Plain 0 Front Yard 0 Front Yard Side Street 0 Rear Yard 0 Side Yards 0 Building Area 0 Parking Standards 0 Off-Street Loading Standards 0 Vision Clearance 0 Transitional Yard Standards COMMENTS: DEFICIENT 0 Landscape Standards 0 Height 0 Conditions of Approval 0 Compliance with P.C. or BZA Conditions of Approval 0 Signage Standards 0 Mechanical Equip. Screening 0 Parking Lot Lighting REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approve all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows, etc., when the use is conforming and when no change is proposed. Sf APPROVED Plan Commission Action Required 0 DENIED Variance(s) Required REVIEWED BY: )'l:- DATE: 1¿:;-/7ror 2003