Loading...
HomeMy WebLinkAbout2005-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 3955 SUMMERVIEW DR CITY OF OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD No 116790 Contractor M P KELLY Category 411 - Residential-Water Heaters Create Date 10/14/2005 Plan Owner PETER J/BETH A CULP Bathtub 0 Shower 0 Water Softner 0 Wait.S!. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn ---2 RPZ Valve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain ---2 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ofWork r""~~' ~ w,~'"~,~ Size Type # 0 0 0 0 0 0 0 0 0 0 Material Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1528500000 Valuation $694.00 Plan Approval $0.00 Permit Fees $20.00 D Permit Voided I Issued By Date 10/14/2005 In the performance of this work, I agree to perform all work pursuant to rules 90veming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH WI 54901 - 4431 Telephone Number 231-1750 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.