Loading...
HomeMy WebLinkAbout0116788-Plumbing (bar sink) e OSHKOSH ON THE WATER Job Address 663 N MAIN ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 116788 Contractor M P KELLY Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 1 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind ----2 Water Softner 0 Local Waste ----2 Clothes Wshr 0 Bidet ----2 Beer Tap 0 Lab Sink ----2 Sterilizer ----2 Dip Well 0 Drink Ftn Owner NATHAN M HENNAGER Create Date 10/14/2005 Category 440 - Industrial-Interior Plan 0 0 0 0 0 0 0 0 0 Wait St. Ice Chest Exam Sink sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink serv Sink 0 Shamp Sink 0 0 FlrlWstsink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap ----2 RPZValve 0 Eye Wash statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature of Work r~~ , ""~, ~ ,,~ Size Sanitary Sewer Storm Sewer Water Service Material Type # 0 0 0 0 0 Conn. Type Parcelld # 0700810000 Valuation $404.00 $20.00 0 Permit Voided I Issued By Plan Approval $0.00 Permit Fees Date 10/14/2005 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST Telephone Number 231-1750 Agent/Owner OSHKOSH WI 54901 - 4431 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.