HomeMy WebLinkAbout0116788-Plumbing (bar sink)
e
OSHKOSH
ON THE WATER
Job Address 663 N MAIN ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116788
Contractor M P KELLY
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 1
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
----2 Water Softner
0 Local Waste
----2 Clothes Wshr
0 Bidet
----2 Beer Tap
0 Lab Sink
----2 Sterilizer
----2 Dip Well
0 Drink Ftn
Owner NATHAN M HENNAGER
Create Date 10/14/2005
Category 440 - Industrial-Interior
Plan
0
0
0
0
0
0
0
0
0
Wait St.
Ice Chest
Exam Sink
sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
serv Sink
0 Shamp Sink 0
0 FlrlWstsink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap ----2
RPZValve 0
Eye Wash statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
of Work
r~~ , ""~, ~ ,,~
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
Type
#
0
0
0
0
0
Conn. Type
Parcelld #
0700810000
Valuation
$404.00
$20.00 0 Permit Voided I
Issued By
Plan Approval
$0.00
Permit Fees
Date 10/14/2005
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
Telephone Number 231-1750
Agent/Owner
OSHKOSH
WI 54901 - 4431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.