HomeMy WebLinkAbout0116787-Plumbing (kitchen sink)
e
OSHKOSH
ON THE WATER
Job Address 1318FAUSTAVE
CITY OF OSHKOSH
No
116787
PLUMBING PERMIT. APPLICATION AND RECORD
Owner MARY JANE RYAN
Category 410 - Residential-Interior
Contractor M P KELLY
Create Date 10/14/2005
Plan
Bathtub 0 Shower ~ Water Softner 0 Wait. St. 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory ~ LndryTray 0 Clothes Wshr 0 Exam Sink 0
Toilet ~ Disposal ~ Bidet 0 Sculry Sink 0
Res. Sink ----1 Dishwasher ~ Beer Tap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater ~ Classrm Sink ~ Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrm Sink ~ DipWell ~ F Prep Sink 0
Roof Drain 0 Ejector/Grind ~ Drink Ftn ~ Serv Sink 0
Misc. 0
Fixtures
Shamp Sink ~
FlrlWst Sink ~
Catch Basin 0
Wash Ftn ~
Urinal 0
Standp Rec ~
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker ~
Int Grease Trap ~
Ex! Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
of Work
re, , ,&~, m,"" .~
Size
Material
Sanitary Sewer
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
0608771100
Valuation
$1,140.00
$0.00
Permit Fees
Plan Approval
Issued By
Date 10/14/2005
In the performance of this work, I agree to perform all work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
AgenUOwner
OSHKOSH
Telephone Number 231-1750
WI 54901 - 4431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.