HomeMy WebLinkAbout0116791-Plumbing (laundry tub)
e
OSHKOSH
ON THE WATER
Job Address 1666 DELAWARE ST
CITY OF OSHKOSH
No
116791
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor M P KELLY
Category 410 - Residential-Interior
Create Date 10/14/2005
Plan
Owner H RICHARD BISHOP
Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Shamp Sink ~ Coffee Maker 0
Whirlpool ~ Floor Drain 0 Local Waste 0 Ice Chest 0 FlriWst Sink ~ Int Grease Trap 0
Lavatory ~ Lndry Tray -------1 Clothes Wshr 0 Exam Sink 0 Catch Basin ~ Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink ~ Dishwasher ~ Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink ~ Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater ~ Classrm Sink ~ Sterilizer ~ Surgeons Sink 0 Ice Maker ~ Deduct Meters 0
Site Drain ~ Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs
Roof Drain ~ Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
[ffi' ~e~" ~""~ '""
Size
Material
Type
#
Conn. Type
Sanitary Sewer
0
0
0
0
0
Storm Sewer
0
0
0
0
0
Water Service
Parcelld #
1302130100
Valuation
$554.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Issued By
Date 10/14/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 665 N MAIN ST
AgenVOwner
OSHKOSH
WI 54901 - 4431
Telephone Number
231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.