HomeMy WebLinkAbout0116760-Building (porch roof)
0
OSHKOSH
ON THE WATER
Job Address 44W11THAVE
CITY OF OSHKOSH
No
116760
BUILDING PERMIT. APPLICATION AND RECORD
Owner CHARLES P MORTENSON
Create Date
10/13/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
D Projection I
Canopies 0
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
. Pier
0 Treated Wood
0 Other
4' deep frost pier or post
Occupancy Penn it Required
Flood Plain
Height Pennit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature Duplex! Reinstall5x12 side porch roof. Roof shall be supported by a frost foundation.' Victor Page, land contractor, is the contractor.
of Work Has foreclosed on this property.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
700.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 10/13/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0302500000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature V ~ 1<' a-¡-r
Agent/Owner
Date I ð d J/ e>5""
Address
Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.