Loading...
HomeMy WebLinkAbout0116760-Building (porch roof) 0 OSHKOSH ON THE WATER Job Address 44W11THAVE CITY OF OSHKOSH No 116760 BUILDING PERMIT. APPLICATION AND RECORD Owner CHARLES P MORTENSON Create Date 10/13/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths D Projection I Canopies 0 Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post . Pier 0 Treated Wood 0 Other 4' deep frost pier or post Occupancy Penn it Required Flood Plain Height Pennit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature Duplex! Reinstall5x12 side porch roof. Roof shall be supported by a frost foundation.' Victor Page, land contractor, is the contractor. of Work Has foreclosed on this property. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 700.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 10/13/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0302500000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature V ~ 1<' a-¡-r Agent/Owner Date I ð d J/ e>5"" Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.