HomeMy WebLinkAbout2005-Building (roof)
0
OSHKOSH
ON THE WATER
Job Address 603SCHOOLAVE
CITY OF OSHKOSH
No
116756
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL AfTERES GORDLEY
Create Date
10/13/2005
Contractor
OWNER
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
uJ
Zoning
Class of Const:
Size
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
----2 Sq. Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Fioating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature
ofWork
FRlAdd 1-layer of roofing to the existing single-layer on house.' NO STRUCTURAL WORK. Permit issued to Owner's daughter - Mattea
lien (tenant).
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$450.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 10/13/2005
Final/O.P. 00/00/0000
0 Permit Voi~
Parcelld # 0201450000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a panty, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature '('Yìc.t ~~o.. \~ H, ~ ,f\
Address
AgenUOwner
Oshkosh
WI 54901 - 0000
Date !«)~ 13-05
Telephone Number d::f) - (J 7 <.[ g
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, We will assume the project is ready at the time the request is received, Work may
continue if the inspection is not performed within two business days from the time the project is ready.