HomeMy WebLinkAbout0116758 P
G
OSHKOSH
ON THE WATER
Job Address 600 S KOELLER ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner 2020 MINNESOTA LLC
Contractor JIM'S PLUMBING & HEATING INC
Category 440 - Industrial-Interior
Bathtub 0 Shower 0 Watersoftner 0 Wail.sl. 0
Whirlpool 0 Floor Drain 3 Local Waste 0 Ice Chest 2
Lavatory 4 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0
Toilet 4 Disposal 1 Bidet 0 sculry Sink 1
Res. Sink 0 Dishwasher 1 Beer Tap 0 Hand Sink 5
Bar Sink 1 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 2 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 2 Breaknm Sink 0 Dip Well 0 F Prep Sink 2
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 1
Misc. 2
Fixtures
Use/Nature
of Work
Shamp Sink ~
FlrlWst Sink 17
Catch Basin ~
Wash Ftn 0
Urinal ~
Standp Rec ~
Ice Maker 1
Gar Drain 0
Soda Disp 2
No
116758
Create Date 09/28/2005
Plan
Coffee Maker --3
Int Grease Trap ~
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Restaurant -Interior Remodel for new owner (Red Robin), EiV NOT PROVIDED FOR POWER VENT WATER HEATERS, SEPARATE
ELECTRiCAL PERMIT REQUIRED
(2 TROUGH DRAIN-MISC )
Size
Material
Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$50,000.00
Plan Approval
$0.00
Penmit Fees
Date 10/13/2005
Issued By
#
0
0
0
0
0
0
0
0
0
0
Conn. Type
Parcelld #
0611620100
0
0
0
0
0
$378.00 D Permit Voided I
in the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit appiication within an easement, the City strongiy urges the penmit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address W6166 GREENVILLE DR
AgenUOWner
GREENVILLE
WI 54942 - 0000
Telephone Number 920-757-5258
Date
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5049 (920) 236-5106 FAX
ON THE WATER
October 12, 2005
Jim's Plumbing & Heating Inc.
W6166 Greenville Drive
Greenville, WI 54942
Ref: Plumbing Plan Approval:
Red Robin Restaurant (remodel interior)
600 S. Koeller St., Oshkosh, WI
Plan 10# E8-167-1005-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been
completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85,
Wisconsin Administrative Code, the plumbing plans and specifications are approved
contingent upon compliance with the stipulation(s) noted below.
1. Employee restroom toilet shall be provided an approved sanitary vent in accord
with requirements of COMM 82.31.
2. Existing exterior grease trap shall be confirmed to meet requirements of size for
the new use at a minimum of 1500 gallons containment per COMM 82.34
3. Re-circulated hot water distribution system shall be insulated against heat loss
per COMM 82.40(5)(b)3.
In the event installation of this plumbing system has not commenced within two years
from this date, this approval shall become void. A new application accompanied by full
examination fees shall be filed and an updated approval received before work may
commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself
liable for any defects in plans or specifications, plan omissions, examination oversight,
construction or any damage that may result in or after installation. The City of Oshkosh
reserves the right to order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City
of Oshkosh before proceeding with actual installation of this plumbing system or any of its
parts.
Respectfully,
Richard Wood,
Plumbing Inspector