HomeMy WebLinkAbout0116748-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1702 OAK ST
Contractor DRUCKS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
0
0
0
0
0
0
1
0
0
0
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
CITY OF OSHKOSH
No
116748
Owner DOROTHY R LAST
0
0
0
0
0
0
0
0
0
Wait St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
PLUMBING PERMIT - APPLICATION AND RECORD
$0.00
Agent/Owner
MENASHA
Permit Fees
Category 411 - Residential-Water Heaters
Create Date 10/12/2005
Plan
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
0
0
0
0
0
0
0
~
0
Shamp Sink 0
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap ~
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
~FR / GAS WATER HEATER REPLACEMENT
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1510490000
Use/Nature
of Work
Valuation
Issued By
$819.00
Plan Approval
$20.00 0 Permit Voided I
Date 10/12/2005
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 355
WI 54952 - 0000
Telephone Number 426-2654
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.