HomeMy WebLinkAbout2005-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 1214 LIBERTY ST
CITY OF OSHKOSH
No
116751
BUILDING PERMIT - APPLICATION AND RECORD
Owner RICHARD STOUFF
Create Date
10/12/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~ Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
---.2
Use/Nature >SFR/lnstaii vinyl siding on house over existing wood siding. Instaii new gutters & downspouts.' NO STRUCTURAL WORK. Electnc not
of Work ~pplicable - no outside lights affected.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$8,400.00 Plan Approval
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Date 10/12/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1203610000
In the performance of this work I agree to perform aii work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this penmit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to sure MY necessary a provals before starting such activity.
:-rf/'- . m
AgenUOwner
Date /¿¡?//_¿7S
Signature
Address
Oshkosh
Wi 54901 - 0000
Telephone Number ~¿Ð Z Ie. o¥,( 1
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.