HomeMy WebLinkAbout0116729-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 8190TTERAVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor OWNER
OWner KURT AlLAURA C PUTZER
Category 411 - Residential-Water Heaters
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 1
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
LndryTray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breaknn Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
WaitSt
Ice Chest
Exam Sink
0
0
0
0
0
0
0
0
0
Shamp Sink ~
Flr/Wst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
No
116729
0
0
0
0
0
0
0
0
0
Bidet
Beer Tap
Lab Sink
Sterilizer
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Create Date 10/11/2005
Plan
Dip Well
Drink Ftn
Coftee Maker ~
Int Grease Trap ~
Ex! Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
WtrSewerMtrs ~
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
of Work
r~~e ~ w"æ """
Sanitary Sewer
Storm Sewer
Water Service
Size
Material
Type
#
0
0
0
0
0
Conn. Type
$225.00
Plan Approval
Parcelld #
0802140000
Valuation
Date 10/11/2005
Issued By
$0.00
Permit Fees
$20.00 D Permit Voided I
In the performance of this work, I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an e ment, the City strongly urges the permit applicant to contact the
easement holder(s) ~nd t ecu ny n ss provals before starting such activity.
Signature
Address
AgenUOwner
Oshkosh
WI 54901 - 0000
Date
Telephone Number
/¿? /'Ý'O,r-
¿) 3' <J""" ~:;¡:=> 'f;?
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.