Loading...
HomeMy WebLinkAbout0116731-Building (exploratory inspection) e OSHKOSH ON THE WATER Job Address 1624 NEBRASKA ST CITY OF OSHKOSH No 116731 BUILDING PERMIT - APPLICATION AND RECORD Owner LESLIE A NEILSEN Create Date 10/11/2005 Designer Contractor TRACY WEEKS CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. ----2 Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ----2 Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ofWork FRI Removing the skirting around the house for expioratory inspection purposes to determine if the building can be repaiJed. The kirting is not to be re-instalied without the approvai of the inspection Department. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: V~ $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 10/11/2005 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 0305930000 In the performance of this work I agree to perform ali work pursuant to ruies governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongiy urges the permit appiicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Signature~ I./-~ Date /O~//-t:J5"' AgenVOwner Address 1737 JEFFERSON ST OSHKOSH WI 54901 - 0000 Telephone Number 292-0905 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue ilthe inspection is not performed within two business days from the time the project is ready.