HomeMy WebLinkAbout0116731-Building (exploratory inspection)
e
OSHKOSH
ON THE WATER
Job Address 1624 NEBRASKA ST
CITY OF OSHKOSH
No
116731
BUILDING PERMIT - APPLICATION AND RECORD
Owner LESLIE A NEILSEN
Create Date
10/11/2005
Designer
Contractor
TRACY WEEKS CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms
0
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
----2 Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature
ofWork
FRI Removing the skirting around the house for expioratory inspection purposes to determine if the building can be repaiJed. The
kirting is not to be re-instalied without the approvai of the inspection Department.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: V~
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 10/11/2005
Final/O.P. DO/DO/DODO
0 Permit Voided I
Parcelld # 0305930000
In the performance of this work I agree to perform ali work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit appiicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature~ I./-~
Date /O~//-t:J5"'
AgenVOwner
Address 1737 JEFFERSON ST
OSHKOSH
WI 54901 - 0000
Telephone Number
292-0905
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue ilthe inspection is not performed within two business days from the time the project is ready.