HomeMy WebLinkAbout0116722-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 2860 W 9TH AVE
CITY OF OSHKOSH
No
116722
BUILDING PERMIT - APPLICATION AND RECORD
Owner RAYMOND L YEARWOOD
Create Date
10/10/2005
Designer
Contractor
LUECKS HOME IMPROVEMENT INC
Category
141-ExteriorRemodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths
[l.PrOjection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFRIlnstalling steel siding on the house and attached garage. Wrapping windows and installing aiuminum soffit and fascia. EIV on file
of Work rom Van Ert Elec.
Plumbing Contractor
HVAC Contractor
Electric Contractor
$11.300.00 Plan Approval
$0.00 Permit Fee Paid
$84.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 10/11/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0654150000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 706 S MAIN STREET
AgenUOwner
OSHKOSH
WI 54902 - 6084
Telephone Number
235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.