Loading...
HomeMy WebLinkAbout0116722-Building (siding) e OSHKOSH ON THE WATER Job Address 2860 W 9TH AVE CITY OF OSHKOSH No 116722 BUILDING PERMIT - APPLICATION AND RECORD Owner RAYMOND L YEARWOOD Create Date 10/10/2005 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141-ExteriorRemodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths [l.PrOjection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFRIlnstalling steel siding on the house and attached garage. Wrapping windows and installing aiuminum soffit and fascia. EIV on file of Work rom Van Ert Elec. Plumbing Contractor HVAC Contractor Electric Contractor $11.300.00 Plan Approval $0.00 Permit Fee Paid $84.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 10/11/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0654150000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 706 S MAIN STREET AgenUOwner OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.