HomeMy WebLinkAbout0116672-Plumbing (sink)
0
OSHKOSH
ON THE WATER
Job Address 1835 WHITE SWAN DR
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116672
Contractor SAMMONS PLUMBING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Disposal
Res. Sink 1 Dishwasher
Bar Sink 0 Sump Pump
Water Heater 0 Classrm Sink
Site Drain 0 Breakrm Sink
Roof Drain 0 Ejector/Grind
Misc. 0
Fixtures
Use/Nature rffi' """~ ""'
of Work
0 WaterSoftner
0 Local Waste
0 Clothes Wshr
0 Bidet
0 BeerTap
0 Lab Sink
0 Sterilizer
0 Dip Well
0 Drink Ftn
Owner ROBERT J SCHMIDT ETAL
Create Date 10/07/2005
Category 410 - Residential-Interior
Plan
0
0
0
0
0
0
0
0
0
Wait.St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink ----2
0 FlrlWst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker ----2
Int Grease Trap ----2
Ext Grease Trap ----2
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
=j
Sanitary Sewer
Size
Storm Sewer
Water Service
Valuation
$1,200.00
Plan Approval
Issued By
$0.00
Material
Permit Fees
Type
#
0
0
0
0
0
Conn. Type
0
0
0
0
0
$20.00 0 Permit Voided I
Parcelld #
1523740000
Date 10/10/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W,MURDOCKAVE
Telephone Number 231-9880
AgenUOwner
OSHKOSH
WI 54901 - 2298
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.