HomeMy WebLinkAbout0116668-Plumbing (water heater)
0
OSHKOSH
ON THE WATER
Job Address 1341 WESTERN ST
CITY OF OSHKOSH
No
116668
PLUMBING PERMIT - APPLICATION AND RECORD
Owner TIMOTHY R KRAUSE
Create Date 1010712005
Contractor SAMMONS PLUMBING
Category 411 - Residential-Water Heaters
Plan
Bathtub 0 Shower 0 Water Sollner 0 WaitSt 0 Shamp Sink 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0
Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0
Roof Drain 0 EjectorlGrind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
UselNature r'" ~ W^= <~'"
of Work
Coffee Maker ~
Int Grease Trap ~
Ex! Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usa!~e Mtrs 0
Size
Material
Type
#
0
0
0
0
0
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$900.00
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
1211600000
Issued By
Dale 1011012005
In the performance of this work, I a9ree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
AgenUOwner
OSHKOSH
WI 54901 - 2298
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.