HomeMy WebLinkAbout0116675-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1624 JEFFERSON ST
CITY OF OSHKOSH
No
116675
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor SAMMONS PLUMBING
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 1
Site Drain 0
Roof Drain 0
Mise, 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner CHRISTOPHER D ROSE
Create Date 10107/2005
Category 411 - Residential-Water Heaters
0 Water Softner
0 Local Waste
0 Clothes Wshr
0 Bidet
0 BeerTap
0 Lab Sink
0 Sterilizer
0 Dip Well
0 Drink Ftn
0
0
0
0
0
0
0
0
0
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Plan
0 Shamp Sink ----.9.
0 FlrlWstSink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
ofWork
r'." W,,""~~,
Sanitary Sewer
Size
Storm Sewer
Water Service
Valuation
$600.00
Plan Approval
Issued By
$0.00
Material
Permit Fees
Type
#
Conn. Type
0
0
0
0
0
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
1504690000
Date 10/10/2005
In the performance of this work, i agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
Telephone Number 231-9880
Agent/Owner
OSHKOSH
WI 54901 - 2298
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.