HomeMy WebLinkAbout0116676-Plumbing (lavatory)
e
OSHKOSH
ON THE WATER
Job Address 1615 GRABER ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116676
Owner MRiMRS THOMAS W LOWTHER
Plan
Contractor SAMMONS PLUMBING
Bathtub 0 Shower 0 Water Softner
Whirlpool 0 Floor Drain 0 Local Waste
Lavatory 0 Lndry Tray 0 Clothes Wshr
Toilet 0 Disposal 0 Bidet
Res. Sink 1 Dishwasher 0 BeerTap
Bar Sink 0 Sump Pump 0 Lab Sink
Water Heater 0 Classrm Sink 0 Sterilizer
Site Drain 0 Breakrm Sink 0 Dip Well
Roof Drain 0 Ejector/Grind 0 Drink Ftn
Misc. 0
Fixtures
Use/Nature r"'~"'"
of Work
Size
Sanitary Sewer
Create Data 10/07/2005
Category 410 - Residential-Interior
0 Wai!.S!.
0 Ice Chest
0 Exam Sink
0 Sculry Sink
0 Hand Sink
0 Plaster Sink
0 Surgeons Sink
0 F Prep Sink
0 Serv Sink
0
0
0
0
0
0
0
0
0
Shamp Sink ----.2
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker ----.2
Int Grease Trap ----.2
Ext Grease Trap ----.2
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Storm Sewer
Water Service
Material
Type
#
0
0
0
0
0
Conn. Type
Parcelld #
1524560000
Valuation
$0.00
$20.00 0 Permit Voided I
$500.00
Plan Approval
Issued By
Permit Fees
Date 10/10/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W.MURDOCKAVE
Agent/Owner
OSHKOSH
WI 54901 - 2298
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.