Loading...
HomeMy WebLinkAbout0116676-Plumbing (lavatory) e OSHKOSH ON THE WATER Job Address 1615 GRABER ST CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 116676 Owner MRiMRS THOMAS W LOWTHER Plan Contractor SAMMONS PLUMBING Bathtub 0 Shower 0 Water Softner Whirlpool 0 Floor Drain 0 Local Waste Lavatory 0 Lndry Tray 0 Clothes Wshr Toilet 0 Disposal 0 Bidet Res. Sink 1 Dishwasher 0 BeerTap Bar Sink 0 Sump Pump 0 Lab Sink Water Heater 0 Classrm Sink 0 Sterilizer Site Drain 0 Breakrm Sink 0 Dip Well Roof Drain 0 Ejector/Grind 0 Drink Ftn Misc. 0 Fixtures Use/Nature r"'~"'" of Work Size Sanitary Sewer Create Data 10/07/2005 Category 410 - Residential-Interior 0 Wai!.S!. 0 Ice Chest 0 Exam Sink 0 Sculry Sink 0 Hand Sink 0 Plaster Sink 0 Surgeons Sink 0 F Prep Sink 0 Serv Sink 0 0 0 0 0 0 0 0 0 Shamp Sink ----.2 FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker ----.2 Int Grease Trap ----.2 Ext Grease Trap ----.2 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Storm Sewer Water Service Material Type # 0 0 0 0 0 Conn. Type Parcelld # 1524560000 Valuation $0.00 $20.00 0 Permit Voided I $500.00 Plan Approval Issued By Permit Fees Date 10/10/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522W.MURDOCKAVE Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.