HomeMy WebLinkAbout0116720-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 1843 ARIZONA ST
CITY OF OSHKOSH
No
116720
BUILDING PERMIT - APPLICATION AND RECORD
Owner JASON ELLIS
Create Date
10/10/2005
Contractor
OWNER
Designer
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-----9. Sq. Ft.
-----9. Sq. Ft.
Rooms
0
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
-----9. Sq. Ft.
Baths
Signs
-----9.
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
~
Park Dedication
Use/Nature SFRITear off and replace existing roofing on house. 'NO STRUCTURAL WORK.
of Work
.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: \~
I
$1.400.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 10/10/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1405260000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is nota party. if you perform the work
described in this permit application within an easement. the City strongiy urges the permit applicant to contact the easement
holder(s) and to S~ecure anynece/~ papprovals before starting such activity.
Signature CV~ ." d/ A;JM Date
Agent/Owner
Address
Oshkosh
WI 54901 - 0000
Telephone Number
I()~ jÒ -,6 ç
d--1i -[t/o"!;
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.