Loading...
HomeMy WebLinkAbout0116634-Building (roof) G OSHKOSH ON THE WATER Job Address 252 W 14TH AVE CITY OF OSHKOSH No 116634 BUILDING PERMIT - APPLICATION AND RECORD Owner CLIFFORD J NEUBAUER Create Date 10/06/2005 Designer Contractor DANE CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Signs 0 Garage ~Sq.Ft. Baths 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature IDUPLEX/ RENTAL TEAR OFF & REPLACE EXISTING ROOFING ON HOUSE. NO STRUCTURAL CHANGES of Work Plumbing Contractor HVAC Contractor Electric Contractor $5.500.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 10/06/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0901610000 In the performance of this work I agree to perfonm all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals b<¡Jore starting such activity. Signature /1 ~ t:Þ'-uk Date 10 - {, - Cç Þ"" AgenUOwner Address 3155 HALLIE HALLOW DR Oshkosh WI 54904 - 0000 Telephone Number ?- 74 L fl" ?q( To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.