Loading...
HomeMy WebLinkAbout0116632-Building (windows) e OSHKOSH ON THE WATER Job Address 112W9THAVE CITY OF OSHKOSH No 116632 BUILDING PERMIT - APPLICATION AND RECORD Owner KAREN JEAN REDLIN Create Date 10/06/2005 Designer Contractor ADVOCAP INC Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy Q Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units ~ # Structures 0 Park Dedication Use/Nature ofWork FR /INSTALL 10 REPLACEMENT WINDOWS, SAME SIZE, SAME LOCATION, NO STRUCTURAL CHANGES /INSULATE ATTIC & IDEWALLS NOTE: KNOB & TUBE WIRING TO BE REPLACED, SEPARATE ELECTRICAL PERMIT IS REQUIRED Plumbing Contractor HVAC Contractor Electric Contractor $6,785.32 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 10/06/2005 FinaI/O.P. 00/00/0000 D Permit Voided I Parcelld # 0301150000 In the perfonnance of this work i agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~/ 6(?~~ Agent/Owner Date j¿;t/¡;/oç / / Address PO BOX 1108 FOND DU LAC WI 54936 - 0000 Telephone Number 426-0150 -- To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.