HomeMy WebLinkAbout0116612-Building (remove deck/install window)
G
OSHKOSH
ON THE WATER
Job Address 810 E PARKWAY AVE
CITY OF OSHKOSH
No
116612
BUILDING PERMIT - APPLICATION AND RECORD
Owner VIRGINIA R JUNGWIRTH
Create Date
10/05/2005
Designer
Contractor
READY BUILDERS INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories
Garage ----2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units a
# Structures
a
Use/Nature Duplex! Removing the upper deck and door and installing a window in the existing opening. Two exits stili remain for the dwelling unit.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuatio~
Issued By: ~
$1,800.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 10/05/2005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 1103060000
in the perfonmance of this work i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parry, if you perfonm the work
described in this permit ap . ation within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur necessary provals before starting such activity.
Signatur
~
~er
WAUPACA
Dr- /~/ ~05
Address
WI 54981 - 0000
Telephone Number
715-258-5688, home
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.