Loading...
HomeMy WebLinkAbout0116612-Building (remove deck/install window) G OSHKOSH ON THE WATER Job Address 810 E PARKWAY AVE CITY OF OSHKOSH No 116612 BUILDING PERMIT - APPLICATION AND RECORD Owner VIRGINIA R JUNGWIRTH Create Date 10/05/2005 Designer Contractor READY BUILDERS INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. Rooms Height 0 Ft. Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units a # Structures a Use/Nature Duplex! Removing the upper deck and door and installing a window in the existing opening. Two exits stili remain for the dwelling unit. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuatio~ Issued By: ~ $1,800.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 10/05/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1103060000 in the perfonmance of this work i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parry, if you perfonm the work described in this permit ap . ation within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur necessary provals before starting such activity. Signatur ~ ~er WAUPACA Dr- /~/ ~05 Address WI 54981 - 0000 Telephone Number 715-258-5688, home To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.