Loading...
HomeMy WebLinkAbout0116624-Building (foundation) G OSHKOSH ON THE WATER Job Address 371 FOSTER ST CITY OF OSHKOSH No 116624 BUILDING PERMIT -APPLICATION AND RECORD Owner DEL TRITT CONST LLC Create Date 1010312005 Designer Ross Design Contractor DEL TRITT CONSTRUCTION LLC Category 112 - Foundation Permit Single Family Plan G1-55-0905 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-2 Class of Const: VB Size UnfinishedlBasement ~Sq.Ft. ~Sq.Ft. Rooms Height Oft. D Projection i Canopies Finished/Living Bedrooms 0 Stories Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures -----2 ~~- I'. ""',"00 ~" HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $15,000.00 Plan Approval $0.00 Pennit Fee Paid $174.00 Park Dedication $0.00 Issued By: Date 1010512005 FinaIIO.P. 0010010000 D Permit Voided I Parcelld # 0608701200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to see e a y necessary a ro ¿ore starting such activity. Date /ð -:;;--ð r Signature Address 6228 COUNTY RD N Agent/Owner PICKETT WI 54964 - 9533 Telephone Number 589-4209 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.