Loading...
HomeMy WebLinkAbout0116594-Plumbing e OSHKOSH ON THE WATER Job Address 1400-1406 W SOUTH PARK AVE Contractor O'NEILL ENTERPRISE INC CITY OF OSHKOSH No 116594 PLUMBING PERMIT - APPLICATION AND RECORD Owner ONEILL ENTERPRISES INC Create Date 10/04/2005 Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower 0 WaterSoftner 0 WaitS!. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classnm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature ofWork r",~".'œ~.w, Sanitary Sewer Size 4" Material Plastic Type Lateral # Conn. Type 1 New 0 0 0 0 0 0 0 0 0 Storm Sewer Water Service 1-1/2" Plastic Lateral 1 New 0 0 0 0 $100.00 0 Permit Voided I Parcelld # Valuation $6.000.00 Issued By ~ Plan Approval $0.00 Permit Fees Date 10/04/2005 In the performance of this work. I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W 6TH AVE Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.