Loading...
HomeMy WebLinkAbout0116609-Building (windows) e OSHKOSH ON THE WATER Job Address 3034 SHADOW LN CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116609 Owner SCOTT C S FARMERNANESSA THOMA Create Date 10/04/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---------2 Sq. Ft. ---------2 Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ---------2 Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit # Dwelling Units -------9. # Structures -------9. Park Dedication ~-=:- r'"~-'~..~-"- ~"'. .""", --'""""~'-" '" "'"~ ~.oo_, ~~J Plumbing Contractor HVAC Contractor Electric Contractor Fees: Valuation $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00' Park Dedication $0.00 Issued By: Date 10/04/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1519621200 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictons of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any n s ry approvals before starting such activity. Signature Agent/Owner OSHKOSH Date /o/ô'-i/ó5 . I ~ 54901 - 1438 Telephone Number "3 21..::.13~ Address 30 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.