Loading...
HomeMy WebLinkAbout0116605-Plumbing (laterals) G OSHKOSH ON THE WATER Job Address 3159 QUAIL RUN DR CITY OF OSHKOSH No 116605 PLUMBING PERMIT - APPLICATION AND RECORD 0 0 0 0 0 0 0 ~ 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Contractor VAN HANDEL, TOM CORP Owner ANDREW HOMES INC Create Dale 10/04/2005 Category 401 - Residential-Exterior (laterals) 0 ~ 0 0 0 0 0 0 0 Water Softner Local Waste Plan WI 54913 - 0000 0 Shamp Sink ~ 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bathtub Whirlpool Lavatory Toilet Res, Sink Bar Sink Water Heater Site Drain Roof Drain Misc, Fixtures Use/Nature ofWork Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn 0 0 0 0 0 0 0 0 0 Wai!.S!. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink r""o>"-' Valuation Issued By ,JJ-" Sanitary Sewer Size 4" Storm Sewer 4" Water Service 1-1/2" Material Plastic Plastic Plastic Type Lateral # Plan Approval $0.00 $1,450.00 Permit Fees Conn. Type New Lateral 1 New 0 0 0 0 Lateral New Parcet Id # 0660300000 $150.00 0 Permit Voided i Date 10/04/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform tI1e work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1830 E EDGEWOOD DR Agent/Owner APPLETON Telephone Number 920-735-1221 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i,e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.