Loading...
HomeMy WebLinkAbout0116596-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 1110-1120BAUMANST CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No 116596 Owner W R& S J U GAYHART/K C&M A RASM Plan Create Date 10/04/2005 Category 401 - Residential-Exterior (laterals) Contractor O'NEILL ENTERPRISE INC Bathtub 0 Shower 0 Water Softner 0 Wait St. Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink Toilet 0 Disposal 0 Bidet 0 Sculry Sink Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink Misc. 0 Fixtures 0 Shamp Sink ~ 0 Flr/Wst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 EyeWashStatn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature ofWork I'-"'"~'~) Sanitary Sewer Size 4" Material Plastic # Conn. Type 1 New 0 0 0 0 Storm Sewer Water Service 1-1/2" Plastic Type Lateral . Lateral 1 New 0 0 0 0 Parcelld # 1608680100 Valuation $3,000.00 Issued By (~ $0.00 Permit Fees $100.00 0 Permit Voided I Plan Approval Date 10/04/2005 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 522 W 6TH AVE AgenUOwner OSHKOSH WI 54902 - 0000 920-230-2007 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.