HomeMy WebLinkAbout0116596-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 1110-1120BAUMANST
CITY OF OSHKOSH
PLUMBING PERMIT. APPLICATION AND RECORD
No
116596
Owner W R& S J U GAYHART/K C&M A RASM
Plan
Create Date 10/04/2005
Category 401 - Residential-Exterior (laterals)
Contractor O'NEILL ENTERPRISE INC
Bathtub 0 Shower 0 Water Softner 0 Wait St.
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink
Toilet 0 Disposal 0 Bidet 0 Sculry Sink
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink
Misc. 0
Fixtures
0 Shamp Sink ~
0 Flr/Wst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap ~
Ext Grease Trap ~
RPZ Valve 0
EyeWashStatn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
ofWork
I'-"'"~'~)
Sanitary Sewer
Size
4"
Material
Plastic
#
Conn. Type
1 New
0
0
0
0
Storm Sewer
Water Service
1-1/2"
Plastic
Type
Lateral
.
Lateral
1 New
0
0
0
0
Parcelld #
1608680100
Valuation $3,000.00
Issued By (~
$0.00
Permit Fees
$100.00 0 Permit Voided I
Plan Approval
Date 10/04/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522 W 6TH AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
920-230-2007
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.