Loading...
HomeMy WebLinkAbout0116591-Building (pool) - . y e OSHKOSH ON THE WATER Job Address 1027 ARTHUR AVE CITY OF OSHKOSH No 116591 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES E/MELISSA MCLAUGHLIN JR Create Date 10/03/2005 Designer Contractor OWNER Category 249 - Pools - Inflatable - Portable Plan Type . Buildln9 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ofWork FRilnstalling a 12" round Inflatable pool with 36" side walls. A fence enclbses the yard and was installed under a previous permit. HVAC Contractor Plumbing Contractor Electric Contractor Fees: valkati"Q I ;-- Issued By: \~ $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 10/04/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1607530000 In the perfonmanee of this work I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforee easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1027 ARTHUR AVE AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.