HomeMy WebLinkAbout0116585-Building (demo)
e
OSHKOSH
ON THE WATER
Job Address 150 N KOELLER ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116585
Owner JOHN F SUPPLE JR
Create Date
10/03/2005
Designer
Contractor
GANTHER CONSTRUCTION
Category
232 - Alteration Stores & Customer Service
Plan
Type
. Buiiding
0 Sign
0 Canopy
.
0 Fence
0 Raze
Zoning
Class 01 Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature OMM/ Demo the interior to include removing ail interior partition wails. A seperate permit with plan approval wiil be required for any
01 Work rebuilding.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $10,000.00 Plan Approval
Issued By: ~R
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Date 10/03/2005
Final/O.P. 00/00/0000
0 Penmit Voided I
Parcelld # 0611520300
In tile performance of tIlis work i agree to perfonm ail work pursuant to nuies governing the described construction.
Whiie the City 01 Oshkosh has no authority to enforce easement restrictions of which it is not a party, il you perfonm the work
described in tIlis permit appiication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary appro ais b re starting such activity.
Signature --In
Address 4825 CTY TRK A
Agent/Owner
OSHKOSH
Date,,(/O-3 -0)"
WI 54901 - 0000
Telephone Number
426-4774
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.