Loading...
HomeMy WebLinkAbout0116585-Building (demo) e OSHKOSH ON THE WATER Job Address 150 N KOELLER ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116585 Owner JOHN F SUPPLE JR Create Date 10/03/2005 Designer Contractor GANTHER CONSTRUCTION Category 232 - Alteration Stores & Customer Service Plan Type . Buiiding 0 Sign 0 Canopy . 0 Fence 0 Raze Zoning Class 01 Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ~Sq.Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature OMM/ Demo the interior to include removing ail interior partition wails. A seperate permit with plan approval wiil be required for any 01 Work rebuilding. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,000.00 Plan Approval Issued By: ~R $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Date 10/03/2005 Final/O.P. 00/00/0000 0 Penmit Voided I Parcelld # 0611520300 In tile performance of tIlis work i agree to perfonm ail work pursuant to nuies governing the described construction. Whiie the City 01 Oshkosh has no authority to enforce easement restrictions of which it is not a party, il you perfonm the work described in tIlis permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary appro ais b re starting such activity. Signature --In Address 4825 CTY TRK A Agent/Owner OSHKOSH Date,,(/O-3 -0)" WI 54901 - 0000 Telephone Number 426-4774 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.