HomeMy WebLinkAbout0116561 B
e
OSHKOSH
ON THE WATER
Job Address 1119WINNEBAGOAVE
CITY OF OSHKOSH
No
116561
BUILDING PERMIT - APPLICATION AND RECORD
Owner THAO YANG/NENG XIONG
Create Date
09/30/2005
Designer
Contractor
LUEBKE ROOFING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ------.2 Sq. Ft. Rooms
Finished/Living ------.2 Sq. Ft. Bedrooms
Garage ------.2 Sq. Ft. Baths
Height
Oft.
0 Projection I
Stories
Canopies 0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ----------2
# Structures
0
Use/Nature SFR/ Tear-off roofing, install new roofing on garage only.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$2,310.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 09/30/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0204320000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2550 PROGRESS WAY
Agent/Owner
KAUKAUNA
WI 54130 - 0000
Telephone Number
766-9019
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.