Loading...
HomeMy WebLinkAbout0116559-Building VOID 0 OSHKOSH ON THE WATER Job Address 1703 WESTERN ST CITY OF OSHKOSH No 116559 BUILDING PERMIT -APPLICATION AND RECORD VOID ~ner NOEL M KRUEGER Create Date 09/30/2005 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Canopies Finished/Living Bedrooms 0 Stories Garage ~Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures ~ Use/Nature SFRIlnstaliation 019 vinyl replacement windows in existing openings - NO STRUCTURAL WORK duplicate permit of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2.572.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 09/30/2005 Final/O.P. 00/00/0000 ~ Permit Voided I Parcelld # 1211380000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enlorce easement restrictions of which it is not a party. ilyou perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals belore starting such activity. Signature Date Address 625 FOND DU LAC AVE Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please cali the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.