Loading...
HomeMy WebLinkAbout2005-Building (roof garage) e OSHKOSH ON THE WATER Job Address 1608 ROOSEVELT AVE CITY OF OSHKOSH No 116572 BUILDING PERMIT - APPLICATION AND RECORD OWner. CLYDE F/JANET FRIEDMAN R TRUST Create Date 09/30/2005 Designer Contractor DEWEY HOMES INC Category 141.ExteriorRemodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement --.2 Sq. FI. --.2 Sq. FI. Rooms Height 0 FI. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Signs Garage --.2 Sq. FI. Baths 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ofWork FRI Reroofing the garage. Adding 1 layer to the existing one layer. HVAC Contractor Plumbing Contractor Electric Contractor $600.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: CVf Date 09/30/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1212540000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ecessary ~va, before starting such activity. Signature ~ Date X 7'-.3 0 - aJ Agent/Owner OSHKOSH ~ 54901 - 0000 Telephone Number 920-231-3389 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.