Loading...
HomeMy WebLinkAboutFire Protection System Install . .~ C Ahern Fire Protection A division of..L F. Ahern Co. 201 Mocci, CO"", P.O. Box 1316.. Food d" Lac, WI 54936.1316 TEL (920) 921-9020 . FAX (920) 921-8666 . www.ahemfire.com Wisconsin' Illinois' Missouri' Nebraska' Iowa .= . .¡j!¿\ '" September 27, 2005 Building Inspector -- Brian Noe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, WI 54901 T -920/236-5051 F-920/236-1130 RE: FIRE PROTECTION SYSTEM INSTALLATION PACUR, INc. 3555M6sERSTREET OSHKOSH, WISCONSIN 54901 AHERN FIRE PROTECTION CONTRACT No. 490363 Dear Brian: Enclosed is a copy of the Contractor's Material and Test Certificates covering the above-referenced Fire Protection System Installation for your fileSe '\téry truly yours, AHERN FIRE PROTECTION 4d3JF~ JeffR. Batterman Service Superintendent JRB/ksj LCITYO9-27-".DOC An Equal Opportunity Employer AHERN FIRE PROTECTION Contractor's Material and Test Cemfiêäte for Aboveground Piping PROCEDURE Upon completion ofwcrlc, inspection and tests shall be made by the cont_OI's representative and witnessed by an owner's representative. All detects shall be corrected and system left in servica before contraclor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving euthorities, owners, and _or. «is understood the :::'~':"":'::o"'::":'; :'=':r~~':=- prejudices any claim against """""""'r for fauBy material, poer_nship, or failure to complywRh appmving PROPERTY NAME Pacur, Inc. AFP Contract #: 490363 DATE: August I, 2OOS PROPERTY ADDRESS 3555 Moser Street Oshkosh, WI 54901 ACCEPTED BY APPROVING AUTHORITIES (NAMES) 1. City of Oshkosh (Building Inspector -- Brian Noe) 2. Oshkosh Fire Department (Battalion Chief - Greg Piper) 3. 4. ADDRESS Plans 1. 215 Church Avenue -- PO Box 1130 -- Oshkosh, WI 54901 2. 101 Court Street -- OshkoSh, WI 54901 3. 4. / INSTALLATION CONFORMS TO ACCEPTED PLANS ~ES DNO EQUIPMENT USED IS APPROVED ES DNO IF NO, EXPLAIN DEVIATIONS / HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TQLOCATION ¡ø'YES DNO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? INSTRUCTIONS IF NO, EXPLAIN HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: rivES Item No.'s2 & 3"'" I. SYSTEM COMPONENTS INSTRUCTION ~g be "'<Wa>ded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS DYES at,'oseoattime. 3. NFPA 25 DYES NO LOCATION OF SUPPLIES BUILDINGS SYSTEM System #2 MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE MANUFACTURE FACTOR RATING VikiM Microfasl M OR VK3O0 UDriDhl11T Bronze 2005 5.6 12 155 Oea. Vi~nn M"lCmfast M OR VK3O2 Pendenlln' Chrome 2005 5.6 50 155 Oea. SPRINKLERS PIPE AND TYPE OF PIPE Uahtwall Non-Threadable' Thinwall Threadable FITTINGS TYPE OF FITTINGS Grooved' Threaded' Welded Outlets. Mechanical Tees FLOW ALARM DEVICE. .. MAXIMUM TIME TO OPERATE . THROUGH TEST CONNECTION TYPE I MAKE MODEL MIN. I SEC. Existing I I I N/A I I I EXPLAIN ANY ALARM PROBLEMS: ALARM DEVICES LOW AIR ALARM DEVICE PRESSURE ALARM OPERATED TYPE I MAKE MODEL PROPERLY I I SETTING PSI I N/A YES NO I EXPLAIN ANY ALARM PROBLEMS: CENTRAL MONITORING SIGNALS RECEIVED ALARM SERVICE LOCATION(S) TYPE OR PRESSURE NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER SERVICE DETECTOR FLOW SUPERVISORY SUPERVISING LOCATION(S): STATION (ON-SITE) REMOTE REMOTE NAME OF SERVICE: MONITORING ALARM SERVICE SIGNALING (OFF-SITE) PHONE: OTHER: LOCATION(S): EXPLAIN ANY ALARM SIGNALING PROBLEMS: DRY VALVE I Q.O.D. MAKE MODEL SERIAL NO. I MAKE MODEL I SERIAL NO. I I I I I TIME TO TRIP WATER TRIP POINT AIR TlMEWArER ALARM THROUGH "TEST AIR PRESSURE REACHEOTEST OPERATED CONNECTION'" PRESSURE PRESSURE OUTLET ,> PROPERLY DRY PIPE MIN. I SEC. PSI PSI PSI MIN. SEC. YES NO OPERATING WrTHOUT I I I TEST 00.0. WrTH I I I 00.0. IF NQ, EXPLAIN: OPERATION: 0 PNEUMATIC 0 ELECTRIC 0 HYDRAULIC PIPING SUPERVISED DYES DNO I DETECTING MEDIA SUPERVISED DYES DNO DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES DNO IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN DELUGE & CIRCUIT FOR TESTING <>REACTION ..- DYES ONO VALVES DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE MAKE MODEL LOSS ALARM YES I NO YES I NO MIN. SEC. I 1 LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE FLOOR (FLOWING) PRESSURE INLET 1 OUTLET INLET I OUTLET FLOW REDUCING (PSI) IPS ) tPS ) IPS ) IGPM) VALVE TEST I I Ahem Fire Protection , MEASURED FROM TIME INSPECTORS "TEST CONNECTION IS OPENED. , NFPA 13 ONLY REQUIRES THE 6O-SECONO LIMITATION IN SPECIFIC SECTIONS. 2 Ahem Fire Protection HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) abcve static pressure in excess of 150 psi (10.2 bars) for two hours. Oifferential doy-pipe valve clappers shall be left open during test to prevent damage. All TEST a_round piping leakage shall be slopped. DESCRIPTION ~ Establish -4G-psi (2.7 bars) air pressure and measure drop, which shall not excaed 1-112 psi (0.1 bars) in 24 hours. Test pressure tanks at normal water level and air pressure an,! measure ak pressure drop, which shall no! exceed 1-112 psi (0.1 bars) in 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT SI L-J!ar) for _HRS. IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED DYES œ1iIo .£.- EQUIPMENT OPERATES PROPERLY !EfYES DNO ¡V""'T'-C$~ DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SlliC TE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FO TESTING SYSTEMS OR STOPPING LEAKS? YES DNO DRAIN READING OF GAUGE LOCATED NEAR WATER RESIDUAL PRESSURE WITH VALVE IN TEST TEST SUPPLY TEST CONNECTION:--?-Z-PSI <---Bar) CONNECTION OPEN WIDE:.s:.G- PSI LBar) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPlAIN FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. TESTS ~~~~II~~:;E ~'bl;t UO:D~~~~g~~~~;~~S MATERIAL AND TEST 0 YES Œt1i'o FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING 0 YES IDO IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMP¡j~~~?~O BLANK TESTING GASKETS NUMBER USED LOCATIONS WELDED PIPING YES DNO IF YES... DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? WELDING DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? SIGNATURES DATE LEFT IN SERVICE WITH ALL CONTROL VALVES OPEN: NAME OF SPRINKLER CONTRACTOR AHERN FIRE PROTECTION, 201 MORRIS COURT FOND DU LAC, WI 54935 TESTS WITNESSED BY TITLE FOR PROPERTY OWNER (SIGNED) a.-1\~!i.J.; ,.vj IF NO, EXPLAIN rI Or! «S"e c/ NUMBER REMOVED YES DNO ø<eS ~ DNO DNO ES DNO IF NO, EXPLAIN DATE 3