Loading...
HomeMy WebLinkAbout0116533-Building (windows) e OSHKOSH ON THE WATER Job Address 1703 WESTERN ST CITY OF OSHKOSH No 116533 BUILDING PERMIT - APPLICATION AND RECORD Owner NOEL M KRUEGER Create Date 09/29/2005 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths Size 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 FR\ 9 vinyl repl. windowS in existing openings same size. same location. . Use/Nature ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2.572.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: gr¿ Date 09/29/2005 Final/O.P. 00/00/0000 0 Penmit Voided I Parcelld # 1211380000 In the performance of this work I agree to perform all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is nota party. if you perform thewor!< described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 625 FOND DU LAC AVE Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. -'